摘要
采用反应堆热工水力系统计算分析程序CATHARE分别对模块化小型堆ACP100原型反应堆和非能动余热排出系统(PRHRS)试验装置发生全厂断电事故(SBO)进行模拟,计算结果表明:PRHRS试验装置采用的模拟方法可以较好地反映ACP100反应堆原型的主要热工参数,失真度在可接受范围以内。
The Station Blackout Accidents (SBO) analysis is performed by CATHARE for passive reactor heat removal system (PRHRS) test facility and ACP100 respectively. The results show that the PRHRS test facility, which is designed according to the modified Ishii natural circulation scaling law, is capable of representing the thermal hydraulic parameters of prototype, and the scaling distortions are acceptable.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2015年第3期10-14,共5页
Nuclear Power Engineering