摘要
本文阐述了城轨交通道岔转换设备安全接地存在的问题及原因,对不接地可能存在的问题进行了分析。根据道岔转换设备接地和不接地情况,分析了其目前实际运用情况,并提出了城市轨道交通道岔转换设备应按不接地设计和处理的建议。
This paper describes problems and reasons of safe- ty grounding of urban rail traffic conversion equipment, anal- yzed the ungrounded possible problems. According to the gr- ounded and ungrounded situation of switching device, the au- thor analyzes the present situation of the actual use, and sugge- sted that urban track traffic switching device should be in- stalled in line with ungrounded design and treatment.
出处
《城市建筑》
2014年第33期280-280,共1页
Urbanism and Architecture
关键词
道岔转换设备
接地
城市轨道交通
探讨
switch equipment
grounding
urban track traffic
exploration