从在客运既有线插入42号道岔运输装卸、道岔预拼装、道岔准确定位、既有线拆除方案选定、道岔安全稳定横移等方面入手,阐述了处理42号道岔插入施工技术难点的对策,对在既有客运线上插入42号大号码道岔有一定的借鉴意义。
Starting from aspects of transportation unloading, turnout preassembly, turnout orientation, existing railway line demolishing scheme selection, transverse turnout moving of inserting No. 42 turnout into existing passenger-special railway line, the paper describes countermeasures of inserting No. 42 turnout, which has certain guiding meaning for inserting No. 42 turnout into existing passenger-special railway line.