以重庆轨道交通三号线华新街至观音桥区间隧道工程为背景,利用ANSYS有限元软件对隧道开挖时产生的影响进行了力学模拟,重点分析了地面建筑密集地段隧道双侧壁导坑法施工的稳定性,并以隧道施工安全为目标、控制沉降为基本条件,分析了开挖中产生应力、位移的原因,据此提出了安全的施工控制措施。
Taking the tunnel engineering of Huaxin street-Guanyin bridge of Chongqing rail transit No. 3 line as an example,the paper carries out mechanical simulation of tunnel excavation impact with ANSYS finite software,analyzes construction stability of double-side-drift method at crowded buildings section,takes tunnel construction safety as target and subsidence control as basic conditions,analyzes excavation stress and displacing causes,and finally puts forward construction safety controlling measures.
出处
《山西建筑》
2015年第6期157-159,共3页
Shanxi Architecture
关键词
轨道交通
隧道开挖
力学分析
有限元分析
rail transit
tunnel excavation
mechanical analysis
finite element analysis