摘要 沉井下沉采用上层排水下沉,下层不排水下沉的方式,为确保下沉过程中的土体稳定,沉井制作前四周土层施工封闭性围幕。要有一套能准确控制管道顶进方向的导向机构。管道能否按设计轴线顶进,是长距离顶管成败的关键因素之一。顶进方向失去控制会使管道弯曲,无法到达既定位置,严重的甚至因顶力骤增过大,工程不能进行下去。 The application of subsidence by upper layer drainage and lower layer non-drainage during pushing pipe procedure with open caisson is to secure soil stability. Soil layer construction should be enclosed by surrounding curtain. There should be a set of oriental instrument to help control pipe direction accurately. Whether can the pipe penetrate through the axis defi ne the result of long-distance pipe jacking. If pipe jacking direction loses control, it would curve the pipe, which would result in the failure of the construction project.
作者 刘学士
出处 《湖北成人教育学院学报》 2015年第1期60-62,共3页 Journal of Hubei Adult Education Institute
基金 湖北省人文社科重点研究基地--湖北技能型人才培养研究中心研究成果
关键词 沉井 顶管 围幕 动态控制 open caisson pipe jacking surrounding curtain dynamic control
  • 相关文献

参考文献2

  • 1夏明耀,曾进伦主编..地下工程设计施工手册[M].北京:中国建筑工业出版社,1999:1017.
  • 2叶书麟编著..地基处理[M].北京:中国建筑工业出版社,1988:308.

同被引文献10

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部