5Mavrotas G,Caloghirou Y,Koune J.A model on cash flow forecasting and early warning for multi-project programmes:application to the operational programme for the information society in Greece[J].International Journal of Project Management,2005,23(2):121-133. 被引量:1
6Senouci A.Genetic algorithm-based multi-objective model for scheduling of linear construction projects[J].Advances in Engineering Software,2008,39(12):1023-1028. 被引量:1