期刊文献+

基于概率-非概率混合模型和贝叶斯网络的汽车起重机起重臂屈曲可靠性分析 被引量:7

TRUCK CRANE HOIST BOOM BUCKLING RELIABILITY ANALYSIS BASED ON PROBABILISTIC AND NON-PROBABILISTIC HYBRID MODEL AND BAYESIAN NETWORK
下载PDF
导出
摘要 汽车起重机使用中因起重臂结构失效而导致事故频发,这造成严重经济损失和人员伤亡。因此,提出利用概率-非概率理论和贝叶斯网络对起重臂结构进行可靠性分析,针对起重臂屈曲计算中的区间变量和随机变量,建立概率-非概率混合模型,计算不同条件下臂架发生屈曲失效的概率,利用贝叶斯网络模型计算各失效原因的重要度,最后通过实例分析验证了方法的有效性,为起重臂基于可靠性的设计提供依据。 The accidents of truck crane happen frequently during working because of the structure failure of hoist boom, which result in severe economic loss and casualties. So, the method combining probabilistic and non-probabilistic hybrid reliability theory with Bayesian Network is put forward to analyze the reliability of hoist boom structure. Probabilistie and non- probabilistie hybrid model is built aiming at the interval variables and random variables to calculate the failure probability of boom buckling under different conditions. Bayesian Network model is applied to calculate the importance index of different failure cause. Finally, the validity of the method is verified according to the instance analysis, which can provide evidence for hoist boom design based on reliability.
出处 《机械强度》 CAS CSCD 北大核心 2015年第1期74-78,共5页 Journal of Mechanical Strength
基金 国家自然科学基金项目(51275070)资助~~
关键词 可靠性分析 概率-非概率混合模型 贝叶斯网络 臂架屈曲分析 Reliability analysis Probabilistic and non-probabilistic hybrid model Bayesian Network Boombuckling analysis
  • 相关文献

参考文献13

  • 1郑建校,杨武成,原思聪,耿素花.基于APDL装载机工作装置动臂可靠性分析[J].煤矿机械,2010,31(5):96-99. 被引量:7
  • 2吴岳,何永勇.基于ANSYS的掘进装备典型结构可靠性分析[J].机械设计与制造,2010(9):49-51. 被引量:12
  • 3Zhang Kang,Yangjun Luo,Alex Li.On non-probabilistic reliability-based design optimization of structures with uncertain but bounded parameters[J].Structural Safety,2011,33(3):196-205. 被引量:1
  • 4X.Wang,Z.Qiu,I.Elishakoff.Non-probabilistic set-theoretic model for structural safety measure[J].Acta Mechanical,2008,198(1):51-64. 被引量:1
  • 5Lijie Yang,Songlin Nie,Anqing Zhang.Non-probabilistic wear reliability analysis of swash-plate/slipper of water hydraulic piston motor based on convex model[J].Mechanical Engineering Science,2012,227(3):609-619. 被引量:1
  • 6P.Deghanian,M.Fotohi-Firuzabad,S.Bagheri-Shouraki,et al.Critical component identification in reliability centered asset management of power distribution system via fuzzy AHP[J].IEEE System Journal,2012,6(4):593-602. 被引量:1
  • 7Mohamed Abdelgawad,Aminah Robinson Fayek.Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP[J].Journal of Construction Engineering and Management,2010,136(9):1028-1036. 被引量:1
  • 8Zao Ni,Zhiping Qiu.Hybrid probabilistic fuzzy and nonprobabilistic model of structural reliability[J].Computer and Industrial Engineering,2010,58(3):463-467. 被引量:1
  • 9Zhiping Qiu,Jun Wang.The interval estimation of reliability for probabilistic and non-probabilistic hybrid structural system[J].Engineering Failure Analysis,2010,17(5):1142-1154. 被引量:1
  • 10J.Ren,I.Je kinson,J.Wang,et al.An offshore risk analysis method using fuzzy Bayesian network[J].Journal of Offshore Mechanics and Arctic Engineering,2009,131(4):41101-41112. 被引量:1

二级参考文献8

共引文献19

同被引文献38

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部