摘要
以厦漳公路(厦门段)东孚隧道施工为例,介绍了?229大管棚跟管钻进咬合相接加固技术+十字交叉隔壁后拆式开挖技术在浅埋富水软弱土层隧道开挖过程中的应用;同时利用TGMIS动态智能化监测系统对施工沉降状况进行了数据采集、分析及处理,使围岩变形得到控制,顺利通过了浅埋软弱土层段掘进施工。
This article takes Xia-Zhang highway (Xiamen section) Dongfu tunnel construc-tion as an example. Introduces the application of φ299 big pipe follow with pipe drilling occlu-sal and linking reinforcement technology+cross-located right next door after disassembly type excavation technology in shallow-buried rich water soft soil stratum tunnel excavation process. While using TGMIS dynamic intelligent monitoring system of construction settlement condi-tions for data acquisition,analysis and processing,make the deformation of surrounding rock control,successfully passed the construction of shallow-buried soft soil excavation.
出处
《中国工程科学》
北大核心
2015年第1期81-87,共7页
Strategic Study of CAE
关键词
浅埋
富水软弱土
隧道
管棚
加固
十字交叉隔壁后拆式
开挖
shallow buried
rich water soft soil
tunnel
pipe
reinforcement
cross-located right next door after disassembly type
excavation