期刊文献+

大型LNG储罐预应力钢筋张拉顺序 被引量:3

Tensioning sequence of prestressed reinforcement for large LNG tank
原文传递
导出
摘要 国内针对大型LNG储罐预应力混凝土外罐预应力张拉的研究相对匮乏。为此,将理论分析与数值计算相结合,推导了在张拉阶段罐壁的挠度方程、罐壁纵向弯矩计算公式、罐壁弯曲应力计算公式和罐壁环向应力计算公式。采用ADINA有限元软件建立LNG储罐外罐有限元模型,分析了在各种张拉方案下混凝土外罐的应力、位移及其变化规律。结果表明:在预应力张拉阶段,罐壁底部混凝土处于双向受拉状态,其拉应力接近混凝土的抗拉强度,为最危险部位;预应力钢筋最佳张拉顺序是先张拉全部竖向预应力钢筋,后张拉环向预应力钢筋,其中环向预应力钢筋由上至下依次张拉。研究结果可为大型LNG储罐的建造提供技术支持。 In China, there are fewer studies on tensioning of prestressed concrete outer wall of large LNG tank. In this paper, theoretical analysis and numerical calculation are combined to derive the tank wall deflection equation for tensioning stage, longitudinal wall bending moment calculation formula, wall bending stress calculation formula and wall hoop stress formula. Then, a finite element model for outer wall of LNG tank is established with ADINA software, and it is used to analyze the stress and displacement of outer wall under different tensioning scenarios. The results show that the bottom concrete of the tank is in bidirectional tensile condition in the prestressed tensioning stage, with the tensile stress close to the tensile strength of concrete, making the bottom as the most dangerous part. The preferred tensioning sequence is: vertically prestressed reinforcement, and then circumferentially prestressed reinforcement(which is tensioned sequentially from top to bottom). The results can provide technical support to the construction of LNG tanks.
出处 《油气储运》 CAS 2014年第12期1359-1362,1369,共5页 Oil & Gas Storage and Transportation
基金 山东省自然科学基金"大型LNG储罐预应力混凝土超低温性能研究及其优化设计" ZR2012EEL23
关键词 LNG储罐 预应力混凝土 张拉顺序 有限元分析 LNG tank prestressed concrete tensioning sequence finite element analysis
  • 相关文献

参考文献11

二级参考文献19

  • 1赵贤正,赵政璋,李景明,李东旭.中国陆上天然气资源的特征及发展策略[J].石油学报,2004,25(5):1-5. 被引量:7
  • 2HOUSNER G W. The dynamic behavior of water tanks[J]. Bulletin of the Seismological Society of America, 1963,53(2):381--387. 被引量:1
  • 3FISCHER D. Dynamic fluid effects in liquid-lied flexible cylindrical tanks[J]. Earthquake Engineering and Structural Dynamics, 1979, 7:587--601. 被引量:1
  • 4石油工业部抗振震办公室,中国石油化工总公司抗震办公室.圆柱形储液罐抗震论文集[M].北京:地震出版社,1986. 被引量:1
  • 5BS7777:1993. Flat-bottomed,vertical, cylindrical storage tanks for low temperature service[S]. 被引量:1
  • 6BS 7777-1993 Flat-bottomed, vertical, cylindrical storage tanks for low temperature service [S]. 1993. 被引量:1
  • 7Thiagarajan K P,Rakshit D,Repalle N. The air-water sloshing prob- lem:fundamental analysis and parametric studies on excitation and fill levels[J]. Ocean Engineering, 2011,38 (2/3) : 498-508. 被引量:1
  • 8Chardome V,Verhagen B. Development of a procedure for the ul trasonic examination of 9% nickel LNG storage tank welds using phased array technology[J]. Insight-Non-Destructive Testing and Condition Monitoring, 2008,50 (9) : 490-491. 被引量:1
  • 9Myung W S, Dongil S, Soo H C, et al. Optimal operation of the boil off gas compression process using a boil off rate model for LNG storage tanks[J] Korean Journal of Chemical Engineering, 2008,25(1):7 12. 被引量:1
  • 10Amiya K S, Balaram B, Simha S. An investigation of cylindrical wall of reinforced concrete LNG tank subjected to transverse shear due to wind[J] The 1UP Journal of Structural Engineer ing,2011,7(2):33 49. 被引量:1

共引文献51

同被引文献22

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部