以杭州城西丰潭路注浆为工程背景,通过对现场注浆过程的跟踪、施工阶段路表抬升及路表弯沉的监测,得出了注浆的控制参数、注浆实施阶段路表的抬升控制值,并对路表弯沉的测试结果作了分析,表明了注浆的有效性。
Taking the west city Fengtan road grouting in Hangzhou as the engineering background, through the field grouting process tracking, construction phase road surface uplift and road surface deflection monitoring, gained the grouting control parameters, the road surface uplift con- trol value in grouting implementation stage, and analyzed the road surface deflection test results, showed the grouting effectiveness.
出处
《山西建筑》
2015年第1期138-139,共2页
Shanxi Architecture
关键词
沥青路面
道路注浆
路表抬升
弯沉
asphalt pavement
road grouting
road surface uplift
deflection