2Giovanni Corbetta & David S. Cox. Deepwater Tie-ins of Rigid Lines: Horizontal Spools or Vertical Jumpers. 1999 Offshore Europe Conference, 1999: 2, 3. 被引量:1
6Luo Yu, Jiao Xiangdong, Zhou Canfeng, et al. Welding ro- bot system applied in sub-sea pipeline-installation [J]. Industrial Robot: An International Journal, 2015,42 (1) : 83-92. 被引量:1
7Graaf Vander J, Wolbers D, Boerkamp P. Field experience with the construction of large diameter steel catenary risers in deep water [ C ]. Offshore Technology Conference, Hou- ston,USA, 2005. 被引量:1
8Killeen J P, Dyson K C, Reeves K D, et al. Large diameter SCR delivery challenges [C]. Offshore Technology Conference, Houston,USA, 2005. 被引量:1
9Dick Wlibers, Rob Hovinga. Installation of deep water pip- elines with sled assemblies using the new J-lay system of the DVC batder OTC. 15336[C]. Offshore Technology Comference, Houston, Textrs, USA, 2003. 被引量:1