期刊文献+

基于DEA/AHP两阶段的工程项目评标方法研究 被引量:8

Research on Tender Evaluation Method for Engineering Proiects Based on Two-Stage Model of DEA/AHP
原文传递
导出
摘要 提出了一种基于DEA/AHP两阶段的工程项目评标方法,首先运用模糊综合评判法来确定定性指标的得分并将其作为定性指标值;其次运用DEA方法计算每一对投标方案相对效率的比值并以此为基础构造判断矩阵;最后运用单一层次的AHP方法对各投标方案进行全排序.通过实例分析表明,方法科学实用,能够为一般的工程项目评标活动提供有效的参考. This paper puts forward a tender evaluation method for engineering projects based on two-stage model of DEA/AHP. Firstly, we used the fuzzy comprehensive evaluation method to determine the score of qualitative indicators as qualitative indicators values; secondly, we used the DEA model to calculate the ratio of relative efficiency of every two tenders and on basis of which we constructed a judgment matrix; finally, we used the single layer AHP to sort various tenders fully. The case shows that the method is scientific and practical, providing an effective reference in tender evaluation activity for a general engineering project.
作者 张熠 王先甲
出处 《数学的实践与认识》 CSCD 北大核心 2014年第18期53-58,共6页 Mathematics in Practice and Theory
基金 教育部人文社会科学研究青年基金(14YJC630201)
关键词 数据包络分析 层次分析法 模糊综合评判法 工程项目 评标 DEA AHP fuzzy comprehensive evaluation method engineering project tender evaluation
  • 相关文献

参考文献10

  • 1邹和礼,赵暑生,张龙祥.基于定量与定性指标综合分析的工程项目评标方法[J].铁道学报,2000,22(6):112-115. 被引量:19
  • 2Sinuany-Stern Z,Mehrez A,Hadad Y.An AHP/DEA methodology for ranking decision making units[J].International Transaction in Operational Research,2000,7(2):109-124. 被引量:1
  • 3Charnes A,Cooper W W,Rhodes E.Measuring the efficiency of decision making units[J].European Journal of Operational Research,1978,2(6):429-444. 被引量:1
  • 4Charnes A,Cooper W W,Golany B.Foundations of data envelopment analysis for pareto-koopmans efficient empirical production functions[J].Journal of Econometrics,1985,30(1-2):91-107. 被引量:1
  • 5Seiford L M.Data envelopment analysis:The evolution of state of the art(1978-1995)[J].Journal of Production Analysis,1996,7:99-137. 被引量:1
  • 6Satty T L.A scaling method for priorities in hierarchical structures[J].Journal of Mathematical Psychology,1978,1(1):57-68. 被引量:1
  • 7Satty T L.Axiomatic foundation of the analytic hierarchy process[J].Management Science,1986,23(7):851-855. 被引量:1
  • 8Satty T L,Vargas L G.Uncertainty and rank order in the analytic hierarchy process[J].European Journal of Operational Research,1987,32(1):107-117. 被引量:1
  • 9Zadeh L A.Fuzzy sets[J].Information and Control,1965,8(3):338-353. 被引量:1
  • 10杜栋,庞庆华,吴炎编著..现代综合评价方法与案例精选[M].北京:清华大学出版社,2008:219.

二级参考文献3

  • 1雷胜强,简明建设工程招标承包工作手册,1997年 被引量:1
  • 2王凡,模糊数学与工程科学,1988年 被引量:1
  • 3陈森,公路工程招标与投标管理,1998年 被引量:1

共引文献18

同被引文献66

引证文献8

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部