期刊文献+

轨道交通与城市环境的建设协同 被引量:3

Coordination and Significance of Urban Rail Transit and City Environment Construction
下载PDF
导出
摘要 分析了轨道交通建设可能对周边环境造成的不利影响,如会引起邻近建筑物的沉降、开裂、倾斜,引起管线泄漏等问题。同时,分析了周边环境可能对轨道交通工程产生的不利影响,在已建轨道交通附近出现各种施工活动会导致轨道交通工程变形、破坏。基于轨道交通与周边既有或将有构建物的矛盾无法回避,提出了"建设协同"的概念。指出建设协同的关键点是预先设防,并提出了预先设防的具体设想,以采取种种超前的措施来大大减少社会总成本,实现对各方利益的平等保护。 The possible impact during metro construction over the surrounding environment, such as the settlement, cracks and inclination of the adjacent buildings, the pipeline leakage and so on is described. The negative impact of the environment on metro engineering is also analyzed, because various con- struction activities closer to adjacent metro lines will cause de- formation and damage of subway engineering. Since the con- tradictions between metro and the surrounding buildings are un- able to avoid, a concept of construction coordination is put for- ward. The key in which is to prepare concrete measures in ad- vance, so as to reduce the total social cost and realize a bal- anced protection of the interests of all parties.
作者 朱瑶宏 郦亮
出处 《城市轨道交通研究》 北大核心 2014年第10期8-9,62,共3页 Urban Mass Transit
关键词 地铁保护 城市建筑 建设协同 metro protection city architecture construc-tion coordination
  • 相关文献

参考文献9

二级参考文献50

  • 1周文波,顾春华.双圆盾构施工技术[J].现代隧道技术,2004,41(4):22-32. 被引量:35
  • 2何燕云,阎长虹,许宝田.深基坑工程影响因素浅析[J].西部探矿工程,2004,16(12):1-2. 被引量:3
  • 3张志强,何川.南京地铁区间盾构隧道“下穿”玄武湖公路隧道施工的关键技术研究[J].岩土力学,2005,26(11):1711-1716. 被引量:52
  • 4中国船舶工业勘察设计研究院.上海市明珠线二期工程南浦大桥站工程地质勘察报告[M].上海:中国船舶工业勘察设计研究院,2001.. 被引量:1
  • 5孙钧.质构隧道施工的土体扰动及其环境稳定与控制.1999海峡两岸都市公共工程学术暨实务研讨会论文集[M].上海:上海市土木工程学会,1999.314-333. 被引量:1
  • 6易宏伟.盾构施工对土体扰动与土层移动影响的研究[M].上海:同济大学,1999.. 被引量:1
  • 7徐方京.软土隧道与深开挖引起土体孔隙水压力与地层移动分析[M].上海:同济大学,1991.. 被引量:1
  • 8Terzaghi K. Theoretical soil mechanies [M]. New York: John Wiley & Sons, 1943. 被引量:1
  • 9Hsieh P G, Ou C Y. Shape of ground surface settlement profiles caused by excavation [J]. Canadian Geoteclmical Journal, 1998, 35(6): 1004-1017. 被引量:1
  • 10Ou C Y, Liao J T, Lin H D. Performance of diaphragm wall constructed using top-down method[J]. Journal of Geotechnical & Geoenvironmental Engineering, 1998, 124(9): 798-808. 被引量:1

共引文献554

同被引文献14

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部