期刊文献+

异径三通失效分析 被引量:1

Failure of reducer tee
下载PDF
导出
摘要 为探究武汉市某公司提供的三通断裂件失效原因,首先用三维制图软件绘制了三通的几何模型,导入有限元分析软件进行了应力分析.结果表明,断裂三通失效不是因载荷过大引起的,可能是材料性能不合格或者是材料存在严重缺陷导致的.然后对材料的化学成分、金相组织、材料硬度、断口形貌、微区元素进行了检测分析,发现三通材料镍质量分数少于1.05%,远低于国标镍质量分数大于8%的要求,使不锈钢材料防止电化学腐蚀的能力下降;断口处检测有氯离子存在,且三通存在应力腐蚀现象,有裂纹产生;裂纹扩展到一定尺寸,导致三通发生瞬时断裂. To explore the failure of piping tee fracture provided by one company in Wuhan, firstly, the geometric model of tee joints was drawn and the stress of the tees with finite element analysis software was analyzed. The result shows that the failure of piping tee fracture is probably caused by disqualifica- tion of material properties or material defects rather than overload. Then, the chemical composition, metallographic structure, material rigidity, fracture appearance and micro region element with experi- mental methods were tested. The content of nickle in this tee material is 1.05 %, which is couer than the international standard of 8%, and it affects the performance of materials, especially the ability to prevent electrochemical corrosion; the chloride ions at the point of fracture result in the stress corrosion of tees, thus causing flaws, and the instant fracture of piping tees happens as the flaws extend to a certain size.
出处 《武汉工程大学学报》 CAS 2014年第9期59-65,共7页 Journal of Wuhan Institute of Technology
基金 湖北省冶金产品质量监督检验站与武汉工程大学材料检测中心的大力支持
关键词 断裂三通 检测分析 应力腐蚀 fracture tee test analysis stress corrosion
  • 相关文献

参考文献5

二级参考文献13

  • 1张永泽.对API 6A规范设计强度限制准则的探讨[J].石油矿场机械,1993,22(3):12-17. 被引量:4
  • 2尚小江,邱峰,赵海峰,等.ANSYS结构有限元高级分析方法与范例应用[M].北京:中国水利电力出版社,2005. 被引量:8
  • 3[1]ASME Boiler and Pressure Vessel code (Section Ⅷ.Division 2).SI Edition,2001 被引量:1
  • 4[2]API Spec 16A.Specification for Drilling through Equipment,Second Edition,1997 被引量:1
  • 5MOAVENIS.ANSYS理论与应用[M].欧阳宇,译.北京:电子工业出版社,2003:353-406. 被引量:1
  • 6SMITS Jan G, DALKE Susan I, COONEY Thomas K. The constituent equation of piezoelectric bi- morphs[J].Sensors and Actuator A, 1991, 28(1):41-616. 被引量:2
  • 73,Timoshenko,S.andWoinowsky-Krieger,S..TheoryofPlatesandShells,2ndEdition,McGraw-HillBookCompany,Inc.1959 被引量:1
  • 85,Powell,G.H.Clough,R.W.etal..StressAnalysisofB16.9TeesbytheFiniteElementMethod:AProgressReport,ASMEPaper,71-PVP-40,1971 被引量:1
  • 96,张德姜等编.石油化工装置工艺管道设计手册,第一篇,设计与计算.中国石化出版社 被引量:1
  • 10王玉玄,高百争,刘德平,梁丰.无补偿直埋供热管道应力计算理论探讨[J].煤气与热力,2010,30(7):5-7. 被引量:7

共引文献25

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部