摘要
随着经济的发展,电力行业发展越来越快,输电线路因此不断增加。目前,我国输电线路面临着新建线路与带电线路交叉跨越的现状,如果某地区需要申请停电,停电施工会非常复杂,即使满足了停电需求,施工也要等待很长一段时间,从而影响整个电网工程建设。为了解决这一难题,不停电跨越施工技术应运而生,因此,研究人员必须对输电线路不停电跨越架线施工技术进行分析和总结。笔者结合多年工作经验,从不停电跨越架线施工的一般方法和流程着手,对输电线路不停电跨越架线施工技术作了简要分析。
With the development of economy, electric power industry develops faster and faster and transmission lines increase accordingly. At present, the transmission line is faced with the status that new line crosses with the live line. If power outage is needed to apply for a region, the power construction is very complicated, even if the power outage demand is met, it also needs a long time to carry on the construction, thus affecting the whole power grid construction. In order to solve this problem, the crossing construction technology without power outage arises at the historic moment. Therefore, researchers must analyze and summarize the stringing construction technology of transmission lines crossing without power outage. Combined with work experience for many years, the author makes a brief analysis on the stringing construction technology of transmission lines crossing without power outage from the general method and process of the technology.
出处
《价值工程》
2014年第30期150-151,共2页
Value Engineering
关键词
输电线路
不停电跨越
架线施工
transmission lines
cross without power outage
stringing construction