摘要
因拟建码头前沿线与陆域红线之间距离很近,为保证岸坡稳定和使用期码头结构的正常使用,驳岸段地基处理,设计采用碎石桩复合地基和抗滑桩结合的方式。介绍地基处理方案构想和驳岸前沿线Ⅰ段地基处理方案。该方案可保证安全,造价最优。
Because front line of the planed constructing terminal is near the red line of land. So in order to ensure bank slope stability and normal usage of the wharf structure, the composite foundation with gravel pile and combined anti-slide pile is designed in revetment foundation treatment. The thoughts of foundation treatment and section I foundation of revetment's front line are introduced. This plan could ensure safety and lowest cost.
出处
《港口科技》
2014年第7期13-15,23,共4页
Port Science & Technology
关键词
港口
驳岸
地基处理
碎石桩复合地基
抗滑桩
port
revetment
foundation treatment
composite foundation withgravel pile
anti-slide pile