摘要
以华电产业园分布式能源站项目为例,分析了楼宇分布式能源站装机方案的设计思路和方法。通过计算、分析和合理配置分布式能源站设备,使能源站在满足正常使用要求的前提下,实现了效率最高、投资最小、收益最大。
Give example as distributed energy station in Huadian Industrial Park project,designing ideas of for-building distributed energy station installation schemes were analyzed. Pass through calculation,analysis and reasonable allocation of distributed energy station equipment,an optimized scheme was concluded that the energy station can realize highest efficiency and achieve maximum return at minimum investment,as well as meet the requirements of normal operation.
出处
《华电技术》
CAS
2014年第6期4-7,77,共4页
HUADIAN TECHNOLOGY
基金
华电工程科技基金资助(CHECKJ1412)
关键词
分布式能源站
装机方案
装机容量
主机
调峰
distributed energy station
installation scheme
installed capacity
host
peak shaving