摘要
本文简述了广钢供电系统应用Lonworks网络技术实现CSC2000变电站综合自动化系统的原理,针对主变压器运行的特点和重要性,介绍该系统中变压器间隔保护、监控与测量单元的设计原则。按该原则构成广钢变电站的变压器保护和测控单元,既保证了保护的可靠性和独立性,又满足当地监控和远动的功能要求。
The article describes in brief the method how to realize the integrated automation substation system CSC2000 through Lonworks technique in GISC substation system. In connection with the operating peculiarity and importance of the main transformer, it also introduces the design requirements of protection unit, measuring unit and monitoring unit in the transformer bay. The operation results of the realized GISC substation system show that it can not only ensure the reliability and independence of protection but also satisfy the need of local supervisory system and telecontrol.
出处
《冶金丛刊》
2002年第3期27-29,21,共4页
Metallurgical Collections
关键词
变电站自动化
变压保护
监控
供电系统
substation automation transformer protection monitoring and control