摘要
中华人民共和国行业标准《公路路基施工技术规范》(JTJ033-1995)对填石路堤的压实提出了明确要求,但现行《公路工程概预算定额》中却没有高速公路及一级公路填石路堤的压实定额,只有通过现场试验路和工程实践编制补充定额,才能较合理准确地计列该费用。
Compaction of embankment is clearly required in the'Technical Specifications of Con-struction of Highway Subgrade',which is the sector standard of PRC.But in the current 'Norm for Es ti-mate and Budget of Highway',there is no such norm included for compaction of stone filled embank-ment of Expressway and Class I Highway.For the reasonable and accurate estimation on such cost,a supplementary norm must be compiled on the basis of site pilot road section construction and the exeri-ences accumulated.
出处
《交通标准化》
2002年第4期50-51,共2页
Communications Standardization