期刊文献+

特征值模拟法工程估价快速支持系统研究 被引量:1

Rapid support system for engineering evaluation by eigenvalue simulation
下载PDF
导出
摘要 提出了一种新的特征模拟工程估价方法.通过计算机模拟运算建立了多元高次回归方程,产生模拟函数库.从而只需少量的信息(工程建设、工程管理、工程设计、工程施工)输入,便可在较短的时间内得到较精确的工程估价. s:The rapid support system for engineering evaluation by eigenvalue simulation aims at the improve-ment of work efficiency and accuracy,which is a great significance for engineering construction owners,man-agers,consulter designers,constructors and so on to evaluate the engineering or even really to talk about the price.Meanwhile the rise of accuracy of engineering evaluation and the high speed of work should further im-prove the level of management,te chnique of design and construction.
作者 周树发
出处 《哈尔滨建筑大学学报》 北大核心 2002年第3期112-114,共3页 Journal of Harbin University of Civil Engineering and Architecture
关键词 工程估价 特征值 模拟函数库 快速支持系统 回归分析 多元高次回归方程 eigenvalue simulation function engineering evaluation,rapid support system
  • 相关文献

参考文献5

  • 1关柯,王室仁编..建筑工程经济与企业管理[M].北京:中国建筑工业出版社,1987:319.
  • 2余辉主编..建筑工程投资估算手册[M].北京:中国物价出版社,1993:708.
  • 3谢尊渊主编..建筑施工 第3版[M].北京:中国建筑工业出版社,1998:1228.
  • 4许溶烈.中国土木工程指南[M].北京:科学出版社,1993.. 被引量:1
  • 5陈新民主编..造价工程师常用数据手册[M].北京:中国建筑工业出版社,1999:1648.

同被引文献9

  • 1Arditi D. Construction cost estimating support system [ J ]. Cost Engineering, 2002,44 (10) : 17 - 25. 被引量:1
  • 2Tas E. A building cost estimation model based on cost significant work packages[J]. Engineering Construction and Architectural Management, 2005,12(3) : 251 - 263. 被引量:1
  • 3Morris M R. Improving the accuracy of early cost - estimates for federal construction projects[M]. Washington D.C. Building Research Board, National Research Council, 1990:7- 14. 被引量:1
  • 4Bowlby Roger L, Schriver William R. Observations on productivity and composition of building construction output in the united states[J]. Construction Management and Economics, 1996,4(1) : 1 - 18. 被引量:1
  • 5Yang I Y. Simulation- based estimation for correlated eost elements[J]. International Journal of Project Management, 2005 (23) :275 - 282. 被引量:1
  • 6Kan Phaobunjong. Parametric cost estimating model for conceptual cost estimating of building construction projects[D]. Dissertation presented to the university of texas at austin in partial fulfillment of the requirements for the degree of Doctor of Philosophy, 2002. 被引量:1
  • 7Elkjaer M. Stochastic budget estimation[J]. International Journal of Project Management,2000,18(2):139-147. 被引量:1
  • 8Touran A, Suphot L. Rank correlation in simulating construction costs [J], Journal of Construction Engineering and Management ASCE, 1997,123(3) :297 - 301. 被引量:1
  • 9刘瀛洲,吴养会,袁志发,王乃信.Box-Cox变换的黄金分割法实现[J].西北农林科技大学学报(自然科学版),2001,29(4):125-127. 被引量:3

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部