结合二热轧板坯库工程施工实例 ,介绍CFS桩的试桩试验、施工工艺和检测效果。实践证明 ,采用CFS桩进行地基处理的技术方案合理 ,经济效益明显。
The piling tests on the CFS piles,the construction process and results of measurements are described in combination with some examples of the practice in the construction project of the slab storage at the No.2 Hot Strip Relling Mill.Results demonstrate that the technical plan on laying the foundation using CFS piles is rational and cost effective.
出处
《武钢技术》
CAS
2002年第2期27-30,共4页
Wisco Technology
关键词
地基处理
CFS桩
钢渣挤密桩
construction process CFS pile test evaluation on the result