摘要 热轧板坯库采用双肢钢管混凝土柱作为厂柱。经过10余年使用,出现了吊车梁间连接螺栓破坏、柱间支撑失效和柱顶垫板错位等问题,严重影响了车间的安全生产。针对各种破坏形式进行原因分析,并给出加固方案:增加了吊车梁间连接高强螺栓数量,使其满足强度和疲劳要求;焊接加固柱顶垫板;采取在吊车梁下面设"H"型钢梁,斜腹杆与"H"型钢梁用高强螺栓连接加固柱间支撑。加固方法可以为今后工业厂房设计的改进提供参考。 The concrete filled steel tube with two main elements was adopted at workshop of hot-rolling slab-yard . However, there are many problems such as damages of bolts, failures of column-and-braces, replacement sole plates on the top of columns and so on, which heavily affect the producing at workshop. In the paper, we analyze the causes of these problems and present the corresponding strengthening schemes: increasing the number of high-strength bolts joining crane beams which satisfy tensile strength and fatigue strength;welding sole plates;setting another H-shaped steel beam connecting to supporting bars with high-strength bolts under crane beam for strengthening column-and-brace. We can provide reference for improving industrial factory design from now on.
出处 《四川建筑科学研究》 北大核心 2008年第6期100-103,共4页 Sichuan Building Science
关键词 钢管混凝土柱 吊车梁 柱问支撑 加固研究 concrete filled steel tube crane beam column-and-brace strengthening research
  • 相关文献

参考文献7

二级参考文献6

共引文献688

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部