摘要
大型地下洞室群施工是一个极其复杂的过程 .本文系统地研究了大型地下洞室群施工问题 ,提出了集循环网络计算机仿真技术、可视化面向资源仿真建模技术、网络计划分析与优化技术及基于GIS的动态演示技术于一体的地下洞室群施工系统分析理论方法 ,为选择合理的施工组织方式和最佳的机械设备配置方案、编制可行的施工进度计划和直观掌握了解地下洞室群施工过程提供了有力的分析方法 .研制开发了地下洞室群施工系统仿真与进度分析计算机软件 ( ESAS) ,在溪洛渡地下洞室群施工组织设计中获得了成功的应用 .
The large-scale underground structure group construction is an extremely complicated process. In this paper, the construction process of large-scale underground structure group has been studied systematically. A new method on construction system analysis for large-scale underground structure group, which combines cyclic operation network, network plan and optimum, visual resource-oriented modeling technique and animation demonstration technique based-on GIS, is introduced. The approach described in this paper provides a quantitative analyzing tool for choosing the reasonable construction organization, obtaining the optimum equipment set plan, compiling the construction schedule, and grasping the construction processes. Moreover, the software of construction system simulation and schedule for underground structure group (ESAS) has been developed by authors, which is applied successfully to the construction organization and design of Xiluodu project.
出处
《系统工程理论与实践》
EI
CSCD
北大核心
2002年第3期125-130,共6页
Systems Engineering-Theory & Practice
基金
"九 .五"国家重点科技攻关项目 ( 96 -2 2 1 -0 5 -0 3-0 2 ( 2 ) )
高等学校骨干教师资助计划 ( 6 33)
国家自然科学基金 ( 5 0 1 790 2 3)
关键词
复杂地下洞室群
施工系统
进度
系统仿真
地理信息系统
large-scale underground structure group construction
system simulation
cyclic operation network
network plan and optimum
GIS
animation demonstration technique