摘要
结合某塔式起重机基坑止水+封底帷幕工程,介绍DJP工法止水+封底帷幕在高水位、高渗透性砂层中的成功应用,并对其工艺进行了机理分析。通过分析和本工程基坑开挖效果,证明DJP工法在类似地层条件下施工止水及封底帷幕的可靠性。
This paper introduces the successful application of DJP method waterproof wall and bottomsealing curtain in the sand layer of high water level and high permeability,and it also analyzes the mechanism through tower crane foundation project.Through the analysis of the excavation effect of foundation excavation of this project,the reliability of the DJP method in the construction of water stop and back curtain under similar stratigraphic condition is proved.
作者
刘宏运
张微
LIU Hongyun;ZHANG Wei(Beijing Rongchuang Geotechnical Engineering Co.,Ltd.,Beijing 100085,China)
出处
《施工技术》
CAS
2019年第1期29-30,35,共3页
Construction Technology
基金
浙江省建设厅课题:潜孔冲击高压旋喷桩工法在沿海填海复杂地层中研究与应用
北京市课题:富水砂卵石地层工程建设地下水控制技术研究
关键词
基坑
DJP工法
高压旋喷桩
止水帷幕
施工技术
foundation excavation
down hole jet grouting pile(DJP method)
high-pressure jet grouting pile
waterproof curtain
construction