基于CE的跨座式单轨车辆换轮流程再造与优化

Reengineering and Optimization of Wheel Changing Process for Straddle Monorail Vehicles Based on CE
下载PDF
导出
摘要 此文对现有跨座式单轨车辆双轴转向架换轮作业进行了调研,并对其换轮作业流程进行了分析。根据分析结果,从提升单轨车辆换轮作业效率的角度出发,探讨采用并行工程设计理念对换轮作业流程进行再造与优化,在此基础上提出更为科学、高效、合理的换轮作业流程,按优化的作业流程进行换轮作业可提高12%的效率。 The wheel change operation of double axle bogie for straddle monorail vehicles are investigated in this paper,and the operation process of wheel changing is analyzed. According to the analysis result,the concurrent engineering design concept used to reengineer and optimize the wheel changing process is discussed from the perspective of improving operation efficiency. And the more scientific,efficient and reasonable operating process for wheel changing operation is put forward,which can increase the efficiency of 12%.
作者 谭洪 任光胜 Tan hong;Ren guangsheng
出处 《铁路工程技术与经济》 2019年第1期12-15,43,共5页 Railway Engineering Technology and Economy
关键词 单轨交通 跨座式车辆 换轮作业 并行工程 优化 Monorail traffic Straddle monorail vehicle Wheel changing operation Concurrent engineering Optimization
  • 相关文献

参考文献6

二级参考文献5

共引文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部