考虑多重出力不确定性的风光装机容量优化 被引量:2

Wind and PV installed capacity optimization with hybrid uncertainty of renewable energy
原文传递
导出
摘要 挖掘风电和光伏出力的日特性和月特性,构建基于日特性和月特性的风电/光伏序列模型,通过蒙特卡洛模拟方法,生成多条风电和光伏出力序列,以刻画风/光出力的多重不确定性。考虑风电和光伏多重不确定性出力约束、电力电量平衡约束、允许弃风弃光率约束等,构建风电和光伏收益最大模型,优化风电和光伏装机,保证风电和光伏运行的经济性,实现风电和光伏有序发展。仿真算例表明,在不同的允许弃风弃光率下,风电和光伏的最优装机差异较大,受光伏日特性和装机成本高的影响,只有在弃光率较小且光伏装机容量小的场景下,光伏发电才具有较好的经济效益。 By mining the daily and monthly characteristics of renewable energy,a time series model of wind and PV was presented.Through the Monte Carlo method,several wind and PV time series were produced to depict the hybrid uncertainty of the wind and PV.Based on the hybrid uncertainty constraints of wind and PV,power balance constraint and allowed wind and PV curtailment rate,etc.,the profit maximum model of renewable was proposed to optimize the installed capacities of wind power and PV,to ensure the operation economics of wind power and photovoltaic system.The simulations showed that under different allowed wind and PV curtailment rates,the optimal installation capacities of wind power and PV varied significantly.Due to the unique daily characteristics and high installation cost of PV system,the higher total revenue of PV could be achieved with lower curtailment rate and installation capacity of PV systems.
作者 宋士瞻 王传勇 康文文 张健 闫红华 李鹏 SONG Shizhan;WANG Chuanyong;KANG Wenwen;ZHANG Jian;YAN Honghua;LI Peng(State Grid Zaozhuang Power Supply Company,Zaozhuang 277800,Shandong,China;Shandong Green Power Tech Co.,Ltd.,Jinan 250061,Shandong,China)
出处 《山东大学学报(工学版)》 CAS 北大核心 2018年第6期101-108,共8页 Journal of Shandong University(Engineering Science)
基金 国网山东省电力公司科技项目(项目号:2017A82)
关键词 新能源 风光序列建模 弃风弃光 最优规划 renewable energy wind /PV time series model wind /PV curtailment optimizing planning
  • 相关文献

参考文献7

二级参考文献95

  • 1鲍爱霞.大规模风电场容量可信度的分析及对华东电网备用的影响[J].中国电机工程学报,2009,29(S1):34-38. 被引量:29
  • 2陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26. 被引量:217
  • 3迟永宁,刘燕华,王伟胜,陈默子,戴慧珠.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81. 被引量:499
  • 4Chai C, Lee W J, Fuangfoo P, et al. System impact study for the interconnection of wind generation and utility system[J]. IEEE Trans on IndustryApplications, 2005, 41(1): 163-168. 被引量:1
  • 5GORANSSON L, JOHNSSON F. Large scale integration of wind power moderating thermal power plant cycling[J]. Wind Engineering, 2010, 28(2): 1-15. 被引量:1
  • 6BILLINTON R, BAI G. Generating capacity adequacy associated with wind energy[J]. IEEE Trans on Energy Conversion, 2004, 19(3): 641-646. 被引量:1
  • 7da SILVA A M L, SALES W S, MANSO L A F. Long-term probabilistic evaluation of operating reserve requirements with renewable sources[J]. IEEE Trans on Power Systems, 2010, 25(1): 106-116. 被引量:1
  • 8BILLINTON R, GAO Y, KARKI R. Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation [J]. IEEE Trans on Power Systems, 2009, 24(3): 1375- 1382. 被引量:1
  • 9FORD A P, HARM W L. Market based adequacy: reliability and CBM/ATC calculations[C]// Proceedings of IEEE Power Engineering Society Winter Meeting, January 27-31, 2002, New York, NY, USA: 18-23. 被引量:1
  • 10KARKI R, HU P, BILLINTON R. A simplified wind power generation model for reliability evaluation[J]. IEEE Trans on Power Systems, 2006, 21(2): 533-540. 被引量:1

共引文献1045

同被引文献21

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部