摘要
近年来,我国铁路工程呈现出繁荣的发展态势。在铁路工程施工中,连续梁桥的施工控制对整体施工质量有重要的影响。基于此,论文在研究中以某铁路工程为实例,深入分析铁路工程连续梁桥的施工难点,以供参考。
In recent years,China's railway engineering has shown a prosperous development trend.In railway engineering construction,the control of continuous beam bridge construction has an important impact on the overall construction quality.Based on this,this paper takes a railway project as an example to deeply analyze the construction difficulties of continuous beam bridge in railway engineering for reference.
作者
王晋
WANG Jin(China Railway 12Bureau Group.Ltd.,Taiyuan 030024,China)
出处
《工程建设与设计》
2018年第24期134-135,共2页
Construction & Design for Engineering
关键词
铁路工程
连续梁
施工控制
railway engineering
continuous beam
construction control