期刊文献+

沈阳宝能环球金融中心施工电梯滑动附着装置的研究与应用 被引量:2

Design and Application of the Elevator Sliding Attachment System of Shenyang Baoneng Global Financial Center
下载PDF
导出
摘要 沈阳宝能环球金融中心项目T1塔楼核心筒采用最新一代顶模体系,即"集成平台"进行施工,本工程通过研究并应用施工电梯滑动附着系统,创造性解决了电梯附着难题,使施工作业人员上至平台相应作业面,并且该系统在模架体系顶升时不需要拆卸,可相对于电梯标准节滑动,跟随模架体系平台一起顶升,实现施工模架体系平台在爬升过程中或爬升后仍可正常使用施工电梯上至模架体系。 The core tube of T1 tower of Shenyang Baoneng Global Financial Center Project adopts the newest generation of top mold system,namely the "integrated platform"for construction.This project solves the elevator attachment problems,through the study and application of construction elevator sliding attachment system.The personnel go up to the corresponding working surface of the platform,and the system does not need to be disassembled when the formwork system is lifted up.It can slide relative to the standard section of the elevator and be lifted along with the formwork system platform to achieve the formwork system platform during the climb or after climbing,the elevator can still be used normally.
作者 潘春龙 张世杰 陈思明 张万实 王超 PAN Chunlong;ZHANG Shijie;CHEN Siming;ZHANG Wanshi;WANG Chao(China Construction Third Engineering Bureau Co.,Ltd.,Shenyang,Liaoning 110000,China;China Construction Railway Investment and Construction Group Co.,Ltd.,Beijing 100000,China)
出处 《施工技术》 CAS 2018年第23期33-35,共3页 Construction Technology
基金 中建三局局级课题:超高层建筑智能化施工装备集成平台工业设计及应用
关键词 高层建筑 模架体系 施工电梯 滑动附着装置 研究 tall buildings formwork system elevators sliding attachment research
  • 相关文献

参考文献4

二级参考文献21

共引文献23

同被引文献22

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部