摘要
10MW高温气冷实验堆(HTR-10)调试工作分为三个阶段进行,设计的调试项目共100个。本文简要介绍了HTR-10的系统划分及调试项目的设计原则,并重点介绍了第一阶段装料前冷态调试试验的内容及结果以及对调试不符合项的处理办法。通过调试,全面验证了系统设计的合理性以及设备的可靠性和运行相容性,并获得了满意的结果。
The commissioning of 10MW high temperature gas cooled reactor (HTR-10) is divided into 3 stages and includes 100 test items. This paper introduces systems of HTR-10 and principle of test items planning, especially introduces contents and results of some main test before first fueling, and nonconformity handling. Through these, tests components and systems are verified to meet the performance criteria.