摘要
总工期计算公式表达为基本排序搭接时间的线性函数 ,给出计算基本排序搭接时间和表上作业法寻求优化排序的方法 ,减少了计算工作量 。
Total construction period formula can be expressed as the linear function of time .In this article, it gives the formula to calculate the basic arrangement of overlapping time .It also gives the formula to get optimized order of graphic construction flow process .Then the total calculating work can be reduced. \[
出处
《建筑技术开发》
2001年第12期44-45,共2页
Building Technology Development