摘要
通过化学分析、机械性能试验以及金相分析 ,找出 # 7炉水冷壁爆管的原因 ,从中吸取经验教训 ,为了避免同类事故的发生 。
For keeping the lessons in mind, the cause of tube blast in water wall of boiler No. 7 in Shijiazhuang Cogeneration Power Plant was find out through chemical analysis, mechanical performance tests and metallurgical analysis. To prevent same accident from occurring again, some countermeasures are proposed.
出处
《河北电力技术》
2001年第1期50-52,共3页
Hebei Electric Power