摘要
对石家庄热电厂八期技改工程建设规模为4台410t/hCFB锅炉回料阀的安装、磨损问题进行了分析、总结,为今后类似机组的施工积累了经验。
In 8th phase technical renovation project of Shijiazhuang Cogeneration Power Plant, the installation scale are 4×410 t/h CFB boilers. This paper analyzes and summaries the installation and wear out problem of the material returning devices (J valves), and provides experience for similar units in future construction.
出处
《河北电力技术》
2004年第B12期9-10,共2页
Hebei Electric Power
关键词
CFB锅炉
回料阀
膨胀
浇筑料
磨损
CFB Boiler
material returning device
expansion
grunting material
wear out