针对程潮铁矿 2号主溜井垮落后的稳定状况 ,提出了以“托斗”结构为主要支护形式的总体返修加固方案。实践证明 ,该方案不仅工期短、投资少 ,而且溜井返修后稳定性良好 。
In light of the stability problems of No. 2 main ore-pass at Chengchao Iron Mine resulting form its severe collapse, the authors have put forward the whole reinforcement scheme in which a 'support funnel structure' is its main supporting pattern. The practice has shown that the scheme has the advantages of short time limit for and low investment in the reinforcement project, and good stability of the reinforced ore pass.
出处
《矿冶工程》
EI
CAS
CSCD
北大核心
2001年第3期28-29,32,共3页
Mining and Metallurgical Engineering
关键词
主溜井
托斗法
溜破系统
加固
矿井支护
main ore pass
support funnel method
severe collapse
ore pass fragmenting system