连续梁桥的内力与应力状态,与形成结构的顺序和过程及过程模拟的正确与否密切相关,不同的施工方案以及对施工方案的不同模拟,导致结构产生不同的受力状态。
The state of the internal force and the stress of the continuous beam bridge are relative with the order, the process and the process simulation to come into being structure, the different constructional plan and different simulation to the structure will cause the different forced state.