基于LCC管理方法的电网主设备入网策略 被引量:1

Research of Accessing Strategy of Gird Main Equipment Based on LCC Management Method
下载PDF
导出
摘要 介绍了目前全寿命周期成本(LCC)管理在电网主设备入网方面的应用现状.针对深圳供电局电网主设备存在的具体问题,在LCC管理方法的基础上,从采购策略研究入手,并以电力变压器为例,建立其LCC估算模型,通过具体算例验证分析了LCC管理方法在电网主设备入网方面的科学性和经济性. The urgency of application of the Life Cycle Cost (LCC) management in main equipment accessing grid is presented. The LCC management method and its estimate model are briefly introduced, and the specific problems of grid main equipment in the existing Shenzhen Power Supply Bureau are analyzed. The research of accessing strategy of grid main equipment is developed with the study of the purchasing strategy, which is based on LCC management method. Purchasing strategy is proposed, taking into consideration the LCC management method.
出处 《上海电力学院学报》 CAS 2014年第2期127-130,154,共5页 Journal of Shanghai University of Electric Power
基金 国家自然科学基金(50907039) 上海市教育委员会科研创新项目(12ZZ178) 上海市青年科技启明星计划项目(12QA1401300)
关键词 LCC管理 电网主设备 电力变压器 估算模型 LCC management grid main equipment electric transformer estimate model
  • 相关文献

参考文献11

二级参考文献53

共引文献191

同被引文献10

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部