电网规划方案经济评估方法研究 被引量:39

Study of economy assessment method for electric power gird planning
原文传递
导出
摘要 在提出引入动态经济评价方法———净现值法的基础上,综合考虑可靠性对电网经济性的影响,同时采用敏感性分析法寻找对经济性影响最大的不确定性因素。算例证实了文中提出的对电网规划方案的经济性评价方法的科学性和实用性。 The uncertainty factors should be considered in economy assessment for electric power grid. On introducing the dynamic economy assessment method, the Net Present Value method, the effect of reliability on the economy of the electric power grid was considered comprehensively. The sensitivity analysis method was also applied to find out the uncertainty factor which mostly influences the economy of the gird. The economy assessment method for the grid planning which was put forward in the paper was proved scientific and practical through a computation example.
出处 《华东电力》 北大核心 2004年第7期1-4,共4页 East China Electric Power
基金 上海市自然科学基金资助项目
关键词 电网规划 不确定性因素 净现值 敏感性分析法 electric power gird planning uncertainty factor Net Present Value sensitivity analysis method
  • 相关文献

参考文献5

  • 1王光远.未确知信息及其数学处理[J].哈尔滨建筑工程学院学报,1990,23(4):1-9. 被引量:339
  • 2陈章潮,唐德光编著..城市电网规划与改造[M].北京:中国电力出版社,1998:381.
  • 3LE布西 陈启申译.工业投资项目的经济分析[M].北京:机械工业出版社,1985.. 被引量:2
  • 4.电力工程经济分析暂行条例[S].电力工业部,1998.. 被引量:1
  • 5ELakevi EJHolmes 范明天 张祖平 岳宗斌译.配电网规划与设计[M].北京:中国电力出版社,1999.. 被引量:1

二级参考文献1

  • 1王光远,王文泉.抗震结构的模糊优化设计[J]土木工程学报,1985(02). 被引量:1

共引文献339

同被引文献242

引证文献39

二级引证文献239

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部