5Richard B.Chase,Nicholas J.Aquilano, F.Robert Jacobs. Production andoperation management:manufacturing and service[M].McGraw hill Companies.Inc,8th Edition. 1998.360-394. 被引量:1
2Watanabe T,Hashimoto Y,Nishikawa l,et al.Line balancing using a genetic model[J].Control Eng Practice, 1995,3( 1 ) :69-76. 被引量:1
3Ciobanu G.A branch-and-bound algorithm to solve an assembly line balancing problem[J].Economic Computation and Economic Cybernetics Studies and Research, 1977(4) : 69-79. 被引量:1
4Pang Chuan-Chen.An heuristic method for manufacturing assembly line balaneing[J].Western Eleerie Engineer, 1975,19(4) : 36-45. 被引量:1
5Bhattacharjee T K.An heuristic app roach to general assembly line balancing [J].International Journal of Operations & Production Management, 1988,8( 6 ) : 67-77. 被引量:1
6Rubinovitz J,Levitin G.Genetic algorithm for assembly line balancing[J].Int J Production Economics,1995,41:343-353. 被引量:1
7Amen M.Heuristic methods for cost oriented assembly line balaacing:a survey[J].Int J Production Economics,2000,68:1-14. 被引量:1
8SCHOLL A, BECKER C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J]. European Journal of Operational Research, 2006, 168(3): 666-693. 被引量:1
9SCHOLL A. Balancing and sequencing of assembly lines[M]. 2nd ed. Heidelberg: Physica-Verlag, 1999. 被引量:1
10THOMOPOULOS N T. Mixed model line balancing with smoothed station assignments[J]. Management Science, 1970, 16(9): 593-603. 被引量:1