标准配送式变电站以"标准化设计、工厂化加工、装配式建设"为原则,实现变电站建设真正的全工厂预制现场组装。以枫桥220 kV变电站为例,结合工程的实际情况,从预制舱式二次组合设备、土建设计、即插即用等方面展开标准配送式变电站设计方案的讨论,以期进一步缩短变电站建设工期,提高工程质量和建设效率。
The standard distribution-based substations are based on the principles of"standardized design, in-dustrialized processing and fabricated construction" to implement factory fabrication and field assembly of substation construction. By taking Fengqiao 220 kV substation as an example and in combination with engi-neering practice, the paper discusses the design scheme of standard distribution-based substation in terms of prefabricated cabin secondary combined equipment , civil engineering design as well as plug and play , for the purpose of shortening substation construction , improving project quality and efficiency.
出处
《浙江电力》
2014年第3期31-34,62,共5页
Zhejiang Electric Power
关键词
标准配送式
变电站
设计
建设
standard distribution-based
substation
design
construction