期刊文献+

人工假底在金属矿山的应用现状及展望 被引量:11

Application Status and Prospects of Artificial False Bottom in Metal Mines
下载PDF
导出
摘要 金属矿山采矿工程的底部结构设计是采矿方法设计的关键内容之一,恰当的底部结构对于实现矿体安全高效的回采、提高资源回收率起着至关重要的作用。文章回顾了人工假底的早期应用,介绍了人工假底的理论研究方法以及在金属矿山中的应用现状,重点分析比较了钢筋混凝土、钢结构、膏体充填、坑木和钢筋网柔性隔离等五种人工假底形式的优缺点,并提出了当前迫切需要解决的问题。文章认为随着安全生产意识的加强和矿产资源日益短缺,人工假柱将得到更为广泛的应用。 The bottom structure of mining engineering is a key element in designing mining method for the appropriate bottom structure is favorable to improve the recovery rate and reduce the loss. This paper introduces the theoretical research methods and applications of artificial false bottom in metallic mines. The advantages and disadvantages of five kinds of materials of artificial false bottom including reinforced concrete, steel, paste filling, mine timber and steel mesh flexible isolation are analyzed. Some pressing problems are put forward. Prosthesis column will be widely applied due to the needs of safe mining and mineral shortage.
出处 《中国钨业》 CAS 2014年第1期21-24,共4页 China Tungsten Industry
关键词 金属矿山 人工假底 应用现状 综述 metal mines artificial false bottom application status summary
  • 相关文献

参考文献12

二级参考文献17

共引文献48

同被引文献173

引证文献11

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部