摘要
新集二矿拟开采1上煤层,根据已有巷道的布置特点,以节省投资、方便施工为原则,合理增加了潜水泵系统。文章对新增潜水泵系统从安装方式、设备选型和巷道布置等方面进行回顾和总结,同时指出设计中存在的不足,为煤矿在排水系统改造方面提供成功经验。
Xinji No. 2 Mine was proposed to mine No. lup seam. According to the layout features of the mine available roadways, with the saving investment and convenient construction as a principle, a submersible pump was rationally added in the mine. The paper had a review and summarization on the submersible pump system from the assembling method, equipment selection, mine roadway layout and other process. Meanwhile the paper pointed out the shortages existed in the design could provide successful experiences to reconstruct the water drainage system in the coal mine.
出处
《煤炭工程》
北大核心
2014年第2期12-14,共3页
Coal Engineering