山西大水网隧洞施工危险源及事故防治 被引量:2

Hazard and Accident Prevention in Construction of Tunnels in Shanxi Great Water Supply Network Projects
下载PDF
导出
摘要 为了防控隧洞施工事故,通过较系统地总结和探讨山西大水网小浪底引黄工程长距离隧洞钻爆法施工安全管理的理论和实践活动,提出了"6因素"预防的新概念和做法,克服10个不良思想和正确处理3个关系等,并提出了安全资金管理建议。"6因素"即人、机、料、工序、部位、时段,"10思想"为盲目、粗心、麻痹、侥幸、懈怠、急躁、好奇、逞强、赌气、自满,"3关系"指安全与施工进度、安全与资金、安全与施工质量的关系。建议在招投标阶段施工安全措施列项贴近实际、暂定工程量、采用竞争性单价与合价;在施工阶段,可根据实际需要调整安全措施列项、工程量。建议配置自动监测仪器,强化隧洞施工重点部位的监控、预警。 Regarding the construction of the tunnels of Shanxi Xiaolangdi Yellow River Water Conveyance Project,one of Shanxi Great Water Supply Network Projects,discussion is made on how to safeguard staffs and facilitates on the job site,so as to avoid disasters that may occur in construction of tunnels by means of drill and blast.Some new disasterprevention concepts and measures are proposed,which consist of the six-factor precautions to be kept,ten improper thoughts to be abandoned and three relationships to be well tackled.The six factors include man power,construction machinery,construction materials,tunnel construction procedures,construction areas and working periods; The ten improper thoughts include aimlessness,carelessness,paralysis,luckiness,slackening,impatience,curiosity,flaunt,being rash and self-satisfaction; The three relationships refer to the relationship between safety and progress,the relationship between safety and investment,and the relationship between safety and quality.It is suggested that in the bidding stage,the safety-related working items provided should be in detail,tentative safety-related working quantity should be worked out and competitive quotations in unit prices and total prices should be adopted,and that the safetyrelated working items and the safety-related working quantities can be adjusted in the construction stage.Finally,it is suggested that automatic monitors should be deployed to supervise and predict possible dangers during tunnel construction.
作者 任够平
出处 《隧道建设》 2013年第11期964-970,共7页 Tunnel Construction
关键词 山西大水网 隧洞施工 危险源 Shanxi Great Water Supply Network Projects tunnel construction hazard
  • 相关文献

参考文献14

  • 1吴波著..隧道施工安全风险管理研究与实务[M].北京:中国铁道出版社,2010:434.
  • 2崔英华,沈亮.浅谈长大隧道施工安全管理对策[EB/OL].[2013-09-01].www.chinaqking.com/yc/2012/286308.html. 被引量:1
  • 3任够平.建设工程安全监理工作的探讨[J].山西水利科技,2008(4):89-90. 被引量:3
  • 4赵喜红.黄土隧道施工安全监理要点[J].山西建筑,2012,38(23):244-245. 被引量:2
  • 5曾武.浅谈隧道工程施工技术中的安全管理措施[EB/OL].[2012-09-04].www.59165.corn/dissertation/6/59260.html. 被引量:1
  • 6水利水电规划设计总院.工程建设标准强制性条文:水利工程部分[S].北京:中国水利水电出版社,2010:89-119. 被引量:1
  • 7中国水利水电建设集团公司.SL399-2007水利水电工程土建施工安全技术规程[S].北京:中国水利水电出版社,2008:23-36. 被引量:1
  • 8水利电力部西北电力设计院.DL/T5352-2006高压配电装置设计技术规程[S].北京:中国电力出版社,2007:5-27. 被引量:1
  • 9水利水电规划设计总院.SDJ278-90水利水电工程防火设计规范[S].北京:中国水利水电出版社,1990:12. 被引量:1
  • 10Xiuli Du, Jianjun Zheng, Weiming Yan, et al. Safety control of blasting construction in New Austrian Metro tunnel [ J ]. Advanced Materials Research, 2012,446 - 449 ( 1 ) : 2462 - 2465. 被引量:1

二级参考文献12

共引文献31

同被引文献10

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部