期刊文献+

花园水库枢纽工程坝址选择 被引量:2

Dam-Site Selection of Huayuan Reservoir Hydraulic Engineering Complex in Longjiang County
下载PDF
导出
摘要 根据2008年编制的《黑龙江省千亿斤粮食生产能力建设规划》、2010年4月编制的《松花江流域综合规划》、2010年7月编制的《黑龙江省水利发展"十二五"规划重点工程项目简介》以及2010年编制的《黑龙江省新增1000万亩水田建设规划》,花园水库均被推荐为近期雅鲁河流域综合治理的重点枢纽工程。花园水库总库容3.72亿m3,灌溉面积13.13万hm2,在河段内两坝址按相同的防洪、灌溉任务,按造价曲线和淹没损失曲线估算工程造价和淹没补偿投资,上坝址比下坝址多31123万元,且存在淹没内蒙部分土地的问题,跨省区协调淹没赔偿问题难度大,项目建议书阶段选定下坝址。 In accordance with Planning for 100 Billion jin Grain Production Capability Construction in Heilongjiang Province compiled in 2008,Comprehensive Planning of Songhua River Watershed compiled in April,2010,Brief Introduction of Important Projects in Heilongjiang Province Water Conservancy Development "Twelve Five-year Plans" Planning compiled in July,2010 and Planning for Construction of 10 Million mu Paddy Fields Added Newly in Heilongjiang Province compiled in 2010,the Huayuan Reservoir was recommended as the important hydraulic engineering complex in the comprehensive regulation of Yalu River watershed in the near term.The total storage of Huayuan Reservoir is 0.372 billion m3 and irrigation area is 0.1313 million hm2.The curves of cost and submerge loss were used to estimate the project costs and investment for submerge compensation for the two dam sites located on the river section in light of the same task of flood control and irrigation.The cost of upper dam site is 311.23million Yuan more than the lower dam site,meanwhile,there exists the problems of partial submerged lands in Inner Mongolia,it is difficult to cooperate the submerge compensation problems over the different provinces,and the lower dam site will be selected at the stage of project proposal.
作者 付彦
出处 《黑龙江水利科技》 2011年第4期172-174,共3页 Heilongjiang Hydraulic Science and Technology
关键词 花园水库 工程等级 建设任务 综合效益 灌溉防洪标准 工程选址 淹没补偿 选定下坝址 Huayuan reservoir engineering grade construction task comprehensive benefits standard of irrigation and flood control selection of project site componsation for inundation selection of lower dam-site
  • 相关文献

参考文献5

  • 1王柏乐主编,中国水电工程顾问集团公司编..中国当代土石坝工程[M].北京:中国水利水电出版社,2004:418.
  • 2黄河水利委员会勘测设计研究院.SL274-2001碾压式土石坝设计规范[S].北京:中国水利水电出版社,2002. 被引量:3
  • 3中水东北勘测设计研究有限责任公司.SL303-2004水利水电工程施工组织设计规范[S].北京:中国水利水电出版社,2004. 被引量:17
  • 4张景秀.坝基防渗与灌浆技术[M].北京:中国铁道出版社,1998. 被引量:5
  • 5水利电力水利水电建设总局.水利水电工程施工手册(地基与基础工程)[K].北京:中国电力出版社,2004. 被引量:1

共引文献22

同被引文献5

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部