期刊文献+

大连开发区污水处理一厂升级改造工程设计 被引量:2

Design of Upgrading and Reconstruction Project of WWTP No. 1 in Dalian Economic and Technological Development Zone
原文传递
导出
摘要 介绍了大连开发区污水处理一厂工艺升级改造工程的设计参数、设计流程。工程设计中在充分考虑利用原有设施、设备的基础上实现污水处理厂扩容及提标改造,将原A/O工艺改造为改良A2/O工艺,并可根据需要按改良A2/O工艺或倒置A2/O工艺运行。设计同时还考虑污水处理厂扩建升级过程中的不停产措施,为类似扩建改造工程提供参考借鉴。 The design parameters and process flow of the upgrading and reconstruction project of WWTP No. 1 in Dalian Economic and Technological Development Zone were introduced. The upgrading and reconstruction of WWTP were designed and implemented based on the full use of existing facilities and equipment. The original A/O process was unit could be operated in form of the improved the need. The continuous operation during the design, which provided a reference for similar replaced by the improved A2/O process, and the treatment A2/O process and the inversed A2/O process according to upgrading and reconstruction was taken into account in the upgrading and reconstruction projects.
作者 王姣 鞠凤
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第22期79-82,共4页 China Water & Wastewater
关键词 污水厂升级改造 除磷脱氮 改良A2 O工艺 upgrading and reconstruction of WWTP nitrogen and phosphorus removal im-proved A2/O process
  • 相关文献

参考文献2

  • 1周雹著..活性污泥工艺简明原理及设计计算[M].北京:中国建筑工业出版社,2005:346.
  • 2张自杰 林荣忱.排水工程(第4版)[M].北京:中国建筑工业出版社,2000.. 被引量:18

共引文献17

同被引文献48

引证文献2

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部