在保护层开挖、设备布置、固结灌浆、混凝土温控、金结安装等施工中实施先进的施工技术管理 ,以确保施工进度和施工质量。
The construction experience of the left powerhouse of the Three Gorges Project is described,focusing on excarvation of protection zone,equipment layout,consolidation grouting,concrete temperature control,and installation of metal structures.The main technical measures for ensuring the construction schedule and quality are also presented.
出处
《西北水电》
2000年第4期25-28,共4页
Northwest Hydropower
关键词
三峡工程
水电站厂房
施工进度
left powerhouse,optimal construction,construction schedule,technical measures