水电项目工程超概问题剖析 被引量:1

Analysis on Problems of Cost beyond Budget of Hydropower Projects
下载PDF
导出
摘要 在长期的发展过程中,我国对水电项目建设形成了一套工程造价管理机制,对水电建设管理起到了积极的作用,但随着国家对水电开发进行了一些政策性调整,以及人工、物价长期上涨等原因,造成水电项目建设出现了普遍的超概问题。只有对此有清晰的认识,把握当前和今后我国水电项目建设的实质,才能保证企业科学的决策、理性实施项目投资和控制,恰当处理项目建设相关部门及各参建方的关系;在水电项目的推进过程中,正确领会、积极争取电价及税收等优惠政策,保证水电投资企业赢得长期稳定的投资回报。 In the process of development, China has formed a set of cost management mechanism for hydropower pro-jects,which plays a positive role in hydropower construction management. However,the problems of cost beyond budget are found frequently in hydropower projects due to the adjustments on state policies,the long upsurge in labor and commodity prices and other factors. During the development of hydropower projects,the investment enterprises shall clearly understand the policies on hydropower projects,invest and control rationally,properly deal with the re-lationships of all parties,and actively strive for preferential on-grid tariff and taxes policies so as to win long term and stable investment returns.
作者 朱玉方 宋兴
出处 《红水河》 2013年第5期118-122,134,共6页 Hongshui River
关键词 水电项目 工程超概 造价管理 hydropower project cost beyond budget cost management
  • 相关文献

参考文献1

二级参考文献8

共引文献1

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部