面向协同产品开发过程的多主体资源配置 被引量:5

Multi-agent resource allocation in collaborative product development process
下载PDF
导出
摘要 协同产品开发过程具有分布性、冲突性和协作性等显著特点,这些特点增加了该过程中动态资源配置的复杂性和不确定性。针对这一问题,首先提出一种面向协同产品开发过程的两阶段多主体资源配置方法,该方法包括设计主体的本地选择与管理主体的仲裁两阶段;其次提出设计主体进行本地选择时所依据的任务优先级函数及其算法,并为管理主体建立了混合整数非线性规划仲裁模型;最后,运用通用代数建模系统完成对混合整数非线性规划仲裁模型的求解。应用算例的结果表明,两阶段多主体资源配置方法能够系统评价过程中的各项重要因素,为动态资源配置提供了更为全面的视角,并为今后实时优化的实现打下了坚实的基础。 The significant characteristics such as distribution,conflict and collaboration in Collaborative Product Development (CPD) process increased the complexity and uncertainty of dynamic resource allocation.Aiming at this problem,a two stage Multi-Agent Resource Allocation (MARA) method oriented to CPD process was presented,which included local selection of design agent and arbitration of manager agent.Task priority function and relevant algorithm as the main basis for design agents were given,and a Mixed-Integer NonLinear Programming (MINLP)model was built for manager agent.By using General Algebraic Modeling System (GAMS),MINLP model was solved.The calculation example showed that the proposed method could evaluate the important factors of collaborative product development process systematically,and provide the comprehensive perspective for dynamic resource allocation.Simultaneously,it was the solid foundation of real-time optimization in the future.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2013年第9期2141-2147,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70971146 71171019) 中央高校基本科研业务费资助项目(FRF-TP-12-120A) 中国博士后科学基金资助项目(2012M510323) 中国博士后科学基金特别资助项目(2013T60064)~~
关键词 多主体资源配置 协同 产品开发 通用代数建模系统 multi-agent resource allocation collaboration product development general algebraic modeling system
  • 相关文献

参考文献14

  • 1CHEN C H,LING S F,CHEN Wei, et al. Project scheduling for collaborative product development using DSM [J]. Inter- national Journal of Project Management, 2003, 21(4): 291-299. 被引量:1
  • 2YAN H S, ZHENG W, JIAO X C. Modeling, scheduling and simulation of product development process by extended sto- chastic high-level evaluation Petri nets [J]. Robotics and Com- puter Integrated Manufacturing, 2003, 19(4) : 329-342. 被引量:1
  • 3HERROELEN W, LEUS IL Project scheduling under uncer- tainty: survey and research potentials [J]. European Journal of Operational Research, 2005, 165(2): 289-306. 被引量:1
  • 4CHU Y, BURNS A. Supporting deliberative real-time AI sys- tems: a fixed priority scheduling approach [Oil/Proceedingsof the 19th Euromicro Conference on Real-time Systems. Washington, D. C. , USA.. IEEE, 2007 ; 259-268. 被引量:1
  • 5HANS E W, HERROELEN W, LEUS R, et al. A hierarchi- cal approach to multi-project planning under uncertainty [J]. Omega, 2007, 35(5): 563-577. 被引量:1
  • 6CHEVALEYRE Y, DUNNE P E, ENDRISS U, et al. Issues in multiagent resource allocation [J]. Informatiea, 2006, 30 (1) ; 3-31. 被引量:1
  • 7施国强,李伯虎,柴旭东.基于着色Petri网的复杂产品开发多项目调度建模研究[J].系统仿真学报,2007,19(17):3869-3872. 被引量:20
  • 8DANILOVIC M, BROWNING T R. Managing complex prod- uct development projects with design structure matrices and domain mapping matrices[J]. International Journal of Project Management, 2007, 25(3): 300-314. 被引量:1
  • 9BROWNING T R, YASSINE A A. Resource-constrained mul- ti-project scheduling: priority rule performance revisited [J]. International Journal of Production Economics, 2010, 126(2) : 212-228. 被引量:1
  • 10周婼娜,秦现生,顾学民.并行产品开发模式下任务调度方法研究[J].计算机应用,2007,27(12):3139-3141. 被引量:4

二级参考文献25

共引文献24

同被引文献51

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部