摘要
对水电站厂内经济运行涉及机组组合及负荷分配的相关问题 ,通过对多阶段决策过程可行域分析 ,揭示该模型具有求得整体最优解的功能 ,且算法有效。
To study and build a dynamic programming model for innerplant economic operation ,which decides the number of operating hydraulic turbine units, units combination and load distribution. The distinguishing feature of the algorithm is revealed by analysing the feasible area in multi stage decision process. Case study has showed that the model is able to give the solution for the relating problems mentioned above,and the algorithm is feasible and effective.
出处
《水电能源科学》
2000年第4期14-15,21,共3页
Water Resources and Power
关键词
水电站
经济运行
动态规划
决策分析
hydropower station
economic operation
dynamic programming
decision analys