选择典型截污导流工程——南四湖入湖河流截污导流工程,根据水量和水质条件对设计运行方案进行初步优化,将优化结果与原工程设计调度方案效果进行对比分析。结果表明:联合水量和水质动态调整工程的运行调度能够更有效地发挥工程的截污拦蓄作用,保障南四湖输水期的水质安全。
A typical pollution prevention and water diversion project for rivers flowing into Nansi Lake was studied. Based on water quantity and quality conditions, the operation scheme of the project was initially optimized, and then the optimized scheme was compared with the original operation scheme. The results show that combined water quantity and quality dynamic regulation can fully maximize the project' s capacity for pollution prevention and storage and ensure the safety of the water quality of Nansi Lake during the water transfer period.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
北大核心
2013年第5期395-399,共5页
Journal of Hohai University(Natural Sciences)
关键词
南水北调东线工程
截污导流工程
水量水质联合调度
南四湖
东鱼湖
South-to-North Water Diversion Eastern Route Project
pollution prevention and water diversion project
combined water quantity and quality regulation
Nansi Lake: Dongyu Lake