期刊文献+

高分对地观测系统通用任务规划框架设计 被引量:1

Design of generic mission planning framework for high resolution earth observation satellites
下载PDF
导出
摘要 为了将高分对地观测系统的观测任务分配到卫星和地面站资源上,并满足任务的逻辑、时间和资源约束,设计了一种通用任务规划框架。该框架的核心是分离式资源模板、分层任务模板和通用决策引擎。针对多类型资源定义了分离式资源模板,实例化资源组件映射对地观测系统的各功能结构,以资源组件的组合方式构成对地观测系统的通用描述;针对复杂任务模式定义分层任务模板,将复杂任务分解为带有因果约束的活动网络;针对资源和任务的通用描述设计通用求解引擎,将复杂决策分解为人机结合的决策过程,以最大化满足用户需求。介绍了通用任务规划的框架设计,并通过应用实例说明了该框架对问题的描述和求解过程。 To assign tasks of high resolution Earth Observation Satellite system(EOSs) to satellites and ground station resources while satisfying tasks' logical,temporal and resource constraints,a general mission planning framework was designed.The detachable resource template,hierarchy mission template and general decision engine were the core of this framework,and the detachable resource template was defined for multi-types resource.Each functional configuration of EOSs was mapped by instantiation,and the general description of EOSs was constructed by resource component.Aiming at the complex mission modes,hierarchical mission template was presented as a process of decomposing complex mission into an activity graph with causality constraints.General solution engine for general representation of resource and task was designed,and complicated decision was decomposed into mix-initiative cooperative decision so as to satisfy maximum customers' requirements.A general mission planning platform for EOSs was introduced.Application examples were used to explain problem representation and solution process in the framework.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2013年第5期981-989,共9页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(71031007 70801062 70971131 71071156 71101013 71101150 61203180 71201171) 湖南省研究生创新资助项目(CX2011B023) 国防科学技术大学博士研究生创新资助项目(B110504)~~
关键词 对地观测系统 任务规划 分离式资源模板 任务模板 因果约束 earth observation satellite system mission planning detachable resource template mission template causality constraint
  • 相关文献

参考文献27

  • 1贺仁杰,李菊芳,姚锋,等.成像卫星任务规划技术[M].北京:科学出版社,2010. 被引量:4
  • 2MUSCETTOLA N, SMITH S F, CESTA A, et al. Coordina ting space telescope operations in an integrated planning and scheduling architecture [J].IEEE Control Systems, 1992, 12 (1): 28-37. 被引量:1
  • 3GIULIANO M E, HAWKINS R, RAGER R A status report on the development of the JWST long range planning system [C]//Proeeedings of International Workshop of Planning and Scheduling for Space. Darmstadt, Germany: ESA,2011 : 1-8. 被引量:1
  • 4MUSCETTOLA N, NAYAK P P, PELL B, et al. Williams. Remote Agent: to boldly go where no AI system has gone be- fore [J]. Artificial Intelligence, 1998, 103 (1/2) : 5-48. 被引量:1
  • 5CHIEN S, SHERWOOD R, TRAN D, et al. The EO-1 au- tonomous science Agent [EB/OL]. [2012-05-03]. http://eol. gsfc. nasa. gov/new/validationreport/technology/sensorwebs/ o420. odf. 被引量:1
  • 6CHIEN S, RABIDEAU G, KNIGHT R, et al. ASPEN-auto- mating space mission operations using automated planning and scheduling [C]//Proceedings of International Conference on Space Operations. Reston, Va. , USA : AIAA, 2000 : 1-10. 被引量:1
  • 7FRATINI S, CESTA A. The intt, gration of planning into scheduling with OMP [C]//Proceedings of the 2nd Workshop on Integrating Planning into Scheduling (W1PIS) at AAAI- 05. Menlo Park, Cal. , USA..AAAI,2005:1-8. 被引量:1
  • 8FRATINI S, CESTA A. The APSI framework., a platform for timeline synthesis [C]// Proceedings of the Workshop on Planning and Scheduling with Timelines. Sao Paulo, Brazil: AAAI,2012: 8-15. 被引量:1
  • 9VERFAILLIE G, PRALET C. How to model planning and scheduling problems using timelines [J]. The Knowledge En- gineering Review, 2010,25(3) : 319-336. 被引量:1
  • 10DO M B, KAMBHAMPATI S. SAPA: a multi-objective metric temporal planner [J]. Journal of Artificial Intelli gence Research, 2003, 20 (S1): 155-194. 被引量:1

共引文献3

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部