南京水西门高架桥爆破拆除及振动测试分析 被引量:9

BLASTING DEMOLITION AND VIBRATION ANALYSIS OF SHUIXIMEN VIADUCT IN NANJING
下载PDF
导出
摘要 如何在城区环境复杂条件下进行高架桥的爆破拆除并确保爆破安全,成为城市改扩建过程中亟待解决的难题。以南京市城西干道水西门高架桥爆破拆除工程为例,结合振动监测数据分析,通过高架桥爆破拆除过程中产生的爆破振动和塌落振动的对比研究,得出塌落振动强度与塌落体下落高度的关系,以及塌落振动衰减的一般规律,并提出了降低塌落振动的可行方法,可为类似工程提供参考。 To make the controlled blasting demolition of viaducts in complex urban environment safely has become a hard problem needing to be settled urgently in some urban reconstruction and extension projects.Taking the blasting demolition project of the ShuiXiMen viduct in the west main roads of Nanjing for example,combined with monitor vibration data analysis of the relation between collapse vibration strength and height of the collapse building,collapse vibration attenuation rules was obtained based on the comparison between blasting vibration and collapse vibration in the course of viaduct blasting demolition,and some feasible methods of reducing vibration have been put forward,which could offer reference for future similar projects.
出处 《工程爆破》 北大核心 2013年第3期33-37,共5页 Engineering Blasting
关键词 高架桥 爆破拆除 爆破振动 塌落振动 振动分析 Viaduct Blasting demolition Blasting vibration Collapse vibration Vibration analysis
  • 相关文献

参考文献8

二级参考文献27

共引文献50

同被引文献52

引证文献9

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部